Better zero-shot generalization
1×
1×
Dual-System World Action Models for Asynchronous
Global Planning and Local Refinement
*Equal contribution †Co-corresponding authors
01 / METHOD
02 / METHOD
System 2 refreshes a global plan in the background while System 1 repeatedly denoises one temporally aligned action chunk.
03 / EVALUATION
Leveraging the model’s strong generalization capabilities, our policy can explore multiple interaction approaches to address the sudden problem in exceptional cases.
04 / CITATION
@misc{zheng2026dualwamdualsystemworldaction,
title = {DualWAM: Dual-System World Action Models for
Asynchronous Global Planning and Local Refinement},
author = {Yixin Zheng and Jiangran Lyu and Yuntian Deng and
Kai Liu and Yizhou Zhou and Yizhou Wang and
Xiaoguang Zhao and He Wang and Zhizheng Zhang},
year = {2026},
eprint = {2609.24868},
archivePrefix = {arXiv},
primaryClass = {cs.RO},
url = {https://arxiv.org/abs/2609.24868},
}